Static Equipment Design Section Head

01/2018 – Now                                               Petrojet Company

Achievements/Tasks

  • Participate in the preparing of the belonging section budget in order to present and approving it.
  • Distribute the work activities on the employees under his supervision and ensure that they follow the rules and instructions.
  • Study the design documents according to the code, specifications and requirements of the client.
  • Study the design documents for the technical proposals, out-sourcing design by subcontractor.
  • Prepare the team performance assessment for the sector and submit to the Static Equipment Design Manager.
  • Work on improving the abilities of the sector’s project team and study the required training courses.
  • Assure that the team knows and follows the code of conduct of the company, HSE rules and procedures.
  • Participate in the committees that are related to the working field.
  • Cost control and Follow up the progress of projects and Variation work evaluation.
  • Timely notification of known delays / disruptions / extra work by making regular contemporary records through project team as delays stoppages arise.
  • Review / assist project team in preparation of claims, regular tracking and follow-up of claims.
  • Conflict management between team members if exist.
  • Liaise with the contracts control division, finance and legal department to ensure that contract strategies, tender and contracts are in full compliance with company policies and procedures.
  • Review tender documents and offer comments on condition of contract favoring the company and convey the risk evaluation of various terms and conditions.

Mechanical Design Engineer

04/2012 – 12/2017                                          Petrojet Company

Achievements/Tasks

  • Preparing the Engineering Design of static equipment according to ASME SEC. VIII DIV. I.
 
  • Preparing the workshops fabrication General Arrangement, in-detail drawings and Bill of Material of the static equipment.
  • Follow up the project status and ensure the full compliance between the fabrication and design documents.
  • Participating in problem solution in case of existence during the fabrication.
  • Issue the as built documents according to the marked-up drawings from the fabrication sector.

Fabrication, Construction and Technical Office Engineer

10/2007 – 03/2012                      Petrojet Company

Achievements/Tasks

  • Coordinate and manage the team from supervisors, workers (welder, grinder, fitter) in order to complete a task for fabricating pressure vessels, distillation towers, steel structure and piping spools.
  • Manage the erection process of steel structures, distillation tower internals in oil and gas stations.
  • Surveying of Steel Structure, Pipe Lines and Pressure Vessel Materials, Letters Activities and ISO Activities.
  • Cost Calculation of activities and Sub- Contractors according to the Contract.
  • Preparing the communication methods according to project communications.
  • Material Requisition for Pressure Vessel Material.

Education

B.Sc. in Mechanical Power Engineering,

GPA: 3.03/4.0

Helwan University / Faculty of Engineering 2007  Cairo / Egypt

M.Sc. in Mechanical Design Engineering,

GPA: 3.47/4.0

MA Thesis: “Behavior of Compound Cylinders under Thermo- mechanical Loading Conditions” Helwan University / Faculty of Engineering 2016    Cairo / Egypt